An RCD (safety switch) test record of push-button and trip-time results for each device, aligned to AS/NZS 3760, with pass / fail results, test dates and the next test due.
An RCD (safety switch) test record of push-button and trip-time results for each device, aligned to AS/NZS 3760, with pass / fail results, test dates and the next test due.
AS/NZS 3760 and workplace requirements set RCD test intervals. Push-button tests are typically done every 3 to 6 months and trip-time (operating-time) tests periodically (often every 1 to 2 years, and more frequently on construction and demolition sites). Record results and the next test due on the form.
Electrical installation, testing and inspection work must be carried out by a licensed electrician (some tasks need extra accreditation, for example CEC accreditation for solar). Test-and-tag may be done by a competent person under AS/NZS 3760. Record the technician's name and licence number on the form.
No. This is a free, practical record template aligned to the requirements of AS/NZS 3760. It is not a copy of the published standard and does not replace it. Australian Standards are copyright to Standards Australia. Always work to the current edition of AS/NZS 3760 and your state or territory's requirements.
This is a general template aligned to the requirements of AS/NZS 3760. It is provided as a guide only and is not a substitute for the published standard or manufacturer instructions. Always work to the current edition of the relevant standard and your jurisdiction's requirements, and have routine service carried out by a competent, appropriately licensed person.