A commissioning report for new HVAC installations covering installation checks, functional and performance testing, balancing and handover, with results, settings and sign-off.
A commissioning report for new HVAC installations covering installation checks, functional and performance testing, balancing and handover, with results, settings and sign-off.
This record is used when the equipment is installed or commissioned. The required frequency or trigger depends on the system, its use and the manufacturer's requirements. Record the date and any next-due date on the form.
HVAC maintenance should be performed by a suitably qualified technician. Work involving refrigerant requires the appropriate refrigerant handling licence (ARCtick) in Australia.
Yes, it's free to download and use. It's a practical record template you can adapt to your job and your client's requirements; it does not replace any official certificate or document your state or territory may require, or the manufacturer's instructions.
This is a general template aligned to the requirements of Manufacturer + AS 1668. It is provided as a guide only and is not a substitute for the published standard or manufacturer instructions. Always work to the current edition of the relevant standard and your jurisdiction's requirements, and have routine service carried out by a competent, appropriately licensed person.
traqR auto-schedules recurring hvac systems service, captures photos and defects on site, and stores every record for audit. Try it free for 14 days.