A commissioning report for new HVAC installations — installation checks, functional and performance testing, balancing and handover — with results, settings and sign-off.
A commissioning report for new HVAC installations — installation checks, functional and performance testing, balancing and handover — with results, settings and sign-off.
This record is used when the equipment is installed or commissioned. The required frequency or trigger depends on the system, its use and the manufacturer's requirements — record the date and any next-due date on the form.
HVAC maintenance should be performed by a suitably qualified technician. Work involving refrigerant requires the appropriate refrigerant handling licence (ARCtick) in Australia.
Yes — it's free to download and use. It's a practical record template you can adapt to your job and your client's requirements; it does not replace any official certificate or document your state or territory may require, or the manufacturer's instructions.
This is a general template aligned to the requirements of Manufacturer + AS 1668. It is provided as a guide only and is not a substitute for the published standard or manufacturer instructions. Always work to the current edition of the relevant standard and your jurisdiction's requirements, and have routine service carried out by a competent, appropriately licensed person.
traqR auto-schedules recurring hvac systems service, captures photos and defects on site, and stores every record for audit. Try it free for 14 days.